Welcome to Mondince Bike - A well-known factory specialized in produce carbon bike frame and other parts since 2007.
The lead time depends on the painting design and frame production difficultes. Normally, we need 45 days for the production and 15 days for painting. If the customers need them urgent, we can do this order priority. That means the lead time can be negotiable.